You are here
Home > Posts tagged "ICP"

High voltage specialist Smith Brothers appointed to energise eleven wind turbines

Two wind farms in Scotland are closer to completion following the appointment of Elland-based high voltage electrical engineering firm Smith Brothers. Spread across two adjacent sites, eleven wind turbines will provide a combined output of 23.55MW to the SSE network once energised. 14.35MW of this will be delivered by seven turbines

Smith Brothers powers up the UK’s biggest battery

Power engineering specialist Smith Brothers has contributed its high voltage expertise to powering up the UK’s largest standalone battery storage site. Acting as the Independent Connections Provider (ICP) for the 15MW Lockleaze Fast Frequency Response (FFR) facility in Bristol, the Elland-based firm was enlisted by contractor Metka-EGN to carry out the

Top